मूल · Mula — the root
A motion control company that kept following the problem.
It started with one rig for a driving school that could not afford an imported one. Everything since has been the same question at a different scale.
Vision
That the machines which train, test and build in India should be designed here — not imported, not licensed, and not a decade behind.
Mission
Build motion, vision and control systems that an engineer can open, understand and maintain. Ship the source. Publish the latency. Say what the machine cannot do before the customer finds out.
How we work
Small team, long projects. We take on fewer engagements than we could and stay on each one through commissioning, because a platform that nobody can operate is not a delivery.
- Platforms in the catalogue
- 0Platforms in the catalogue
- Industries served
- 0Industries served
- Degrees of freedom, maximum
- 0Degrees of freedom, maximum
- Control loop rate
- 0 kHzControl loop rate
⚠ Placeholder figures — replace with audited numbers before launch.
यात्रा · Yatra — the journey
Seven years, one direction.
- 2019
A workshop in Indore
The company begins as a two-person effort building a single 3DOF rig for a local driving school that could not afford imported hardware.
- 2021
Motion control, in-house
The decision to design our own drives and firmware rather than integrate someone else's. It cost eighteen months and became the foundation of everything since.
- 2023
Twins and vision
Simulation competence turns outward: the same physics engines that drive a platform can mirror a customer's plant. Vision follows, because a twin needs eyes.
- 2025
Silicon adjacency
Sub-micron positioning work begins for advanced packaging lines — the same motion control problem at a different order of magnitude.
- 2026
Ahead
Autonomous systems validation at scale, and manufacturing depth for the platforms we have so far built one at a time.
⚠ Placeholder narrative — replace with the founder's verified history.
आरम्भ · Arambha — the beginning
Tell us what needs to move.
Most projects start with a constraint someone else called impossible — a payload, a latency budget, a tolerance. Send us yours.